True Services successfully installed a containment system suspended from the roof deck to create a secure and effective protective barrier during construction. The installation was strategically designed to accommodate existing building systems, including exposed HVAC vents, security cameras, and lighting, ensuring uninterrupted operation throughout the project. This solution provided reliable containment and protection while maintaining full functionality and visibility of critical building components
Coordinating around existing building infrastructure required careful planning to ensure all systems remained fully operational throughout the project and the barrier provided full containment. The project required work to be performed after hours with full security considerations. Working at various heights added considerations to ensure full worker safety and regulatory compliances.
True Services addressed these challenges through planning and strategic execution. The team designed the containment system seamlessly around existing HVAC vents, lighting, and security cameras, ensuring all systems remained fully operational while providing complete site protection. Work was scheduled during after-hours, with enhanced security measures in place to safeguard both personnel and the site. Installers used suspension techniques and mechanical equipment at varying heights, adhering to all safety regulations and industry best practices. This approach ensured a safe, efficient, and fully effective containment solution without disrupting ongoing building operations.
Client: Municipal Operations Centre
Location: Hamilton, Ontario
Project Type: Interior Suspended Containment System
Completion Date: December 2026
Duration: 2 months